The problem is not taste. It is the order in which things get decided.
On a job with no design, the decisions all arrive at once and all in a hurry: the socket gets decided with the electrician already at the wall, the unit gets measured after the kitchen is in, the colour gets chosen with the shop about to close. Every one of those rushed decisions costs money twice — once to do, once to put right.
01
Everything decided on paper
By the time the work starts, everything is chosen, measured and specified. The builder builds instead of improvising.
02
A set of documents that reads
Plans, finish schedules with codes, furniture and lighting. Whoever builds it has nothing left to guess.
03
Coordination to the end
Site visits with the minutes written the same day. You have one person for everything, and the assurance that what was designed is what gets built.